What to Do Before Installing a Watercooler?
A documented site survey must be conducted prior to installing a cooler in a facility.
Copies of all surveys should be held at the installer’s premises.
The purpose of the survey is to ensure that the cooler is installed in a suitable location.
Installation guidelines
The general guidelines below should be followed:
- The cooler must be located on a floor that is smooth, level and easily cleaned
- Do not locate the cooler in direct sunlight
- Do not locate the cooler next to the radiator
- Do not locate the cooler within or directly adjacent to toilet facilities
- Do not locate the cooler in constantly damp areas, beneath dripping pipes, or where water may collect underfoot